The Psalms Project Hat

$24.00

Clear
SKU: N/A Category:

Description

Adjustable baseball cap with The Psalms Project logo. It has an unstructured form, a curved visor, and an adjustable buckle strap. Comfort + style!

• 100% chino cotton twill
• Unstructured, 6-panel, low-profile
• 3 ⅛” crown
• Adjustable strap with antique buckle
• Head circumference: 20 ½” – 21 ⅝”

Additional information

Weight N/A