The Psalms Project Light Zip Up Hoodie

$40.00

Clear
SKU: N/A Categories: ,

Description

For when you get chilly on a summer evening by the lake, or simply need something comfy to throw on, this lightweight unisex zip hoodie with a modern fit, hood, front zip, and a kangaroo pocket is the way to go.

• 50% polyester, 25% airlume combed ring-spun cotton, 25% rayon
• Fabric weight 5.6 oz/yd² (189.9 g/m²)
• Unisex fit (men may want to order a size up for a looser fit)
• Side-seamed construction
• Hooded
• Kangaroo pocket

Additional information

Weight N/A

Size Chart

Size guide
S M L XL
Chest to Fit (inches) 34-37 38-41 42-45 46-49
Chest (inches) 16 ¼ 18 ¼ 20 ¼ 22 ¼
Length (inches) 25 ¾ 26 ⅞ 28 29 ⅛