Psalms Project Mug – Red

$20.00$24.00

Clear
SKU: N/A Category:

Description

Whether you’re drinking your morning coffee, evening tea, or something in between – this mug’s for you! It’s sturdy and glossy with a vivid print that’ll withstand the microwave and dishwasher.

• Ceramic
• 11 oz mug dimensions: 3.85″ (9.8 cm) in height, 3.35″ (8.5 cm) in diameter
• 15 oz mug dimensions: 4.7″ (12 cm) in height, 3.35″ (8.5 cm) in diameter
• Dishwasher and microwave safe

Additional information

Weight N/A