Psalm 52 Shirt
from $25.00
This t-shirt is soft and lightweight. made of ring-spun cotton with a polyester blend, it's very comfortable and should last you a long time!
• 100% combed and ring-spun cotton (Heather colors contain polyester)
• Fabric weight: 4.2 oz./yd.² (142 g/m²)
• Pre-shrunk fabric
• Side-seamed construction
Color:
Size:
Quantity: